MLB Park-Los Angeles, CA.

1/7

JPR Inc was contracted in April 2015 to accomadate the re-branding of Left field pavillion area for a major sponsor at MLB park. The scope required complete painting and Polyurea floor coating at approx. 30000 sq. ft . The time frame was 5 days which required a 15 men crew working 12 hour shifts to accomplish the effort prior to Opening Day ceremonies.

© 2017 by JP Rodriguez Inc. 

8994 Claybeck Ave. Sun Valley, CA. 91352

​(O) 818-898-3206
(F)  818-898-3208

www.jprodriguez.com

J.P.  Rodriguez Inc.